Replacing the Grinding Burrs on Miele CM 6xxx Series Coffee Grinders
Replacing the Grinding Burrs on Miele CM 6xxx Series Coffee Grinders
Overview and applicability
This technical article details the procedure for disassembling the coffee grinder assembly, replacing the conical burr set (the outer grinding ring and the inner grinding cone), and reassembling and aligning the grinder.
Confirmed applicability
Machine series: Miele CM 6xxx series fully automatic coffee machines (e.g., CM 61xx and CM 63xx family).
Component: The standalone conical burr grinder unit (motor and gearbox grinder assembly).
This procedure covers servicing the grinder unit after it has been removed from the coffee machine housing. It does not cover opening the machine casing or extracting the grinder assembly from the chassis.
Symptoms and diagnosis
Grinder burrs wear down over time through normal operation or can suffer damage from foreign objects in coffee beans.
Typical symptoms requiring burr replacement
Ground coffee output becomes overly coarse or inconsistent despite fine grind settings.
Coffee extraction is weak, watery, or lacks crema due to under-extraction.
The grinder motor runs noticeably faster or stalls when attempting to grind fine beans.
Inspection of the grinding surfaces shows dull cutting edges, nicks, or rounding on the teeth of the grinding cone or ring.
Replacing the burrs restores sharp cutting geometry and re-establishes the correct gap adjustment between the grinding surfaces.
Tools, materials, and replacement parts
Required tools
Slotted screwdriver, size 5 (approx. 5.0 mm wide flat blade)
Replacement parts and materials
Replacement burr set for Miele CM 6xxx series grinders:
1 outer grinding ring (Mahlring)
1 inner grinding cone (Mahlkegel)
Permanent marker or paint pen (to verify or refresh alignment reference marks)
Note: Component part numbers, fastener thread pitch, and metal alloy specifications are not stated.
Products for this guide
Torx T20H screwdriver — Brewive SKU
STHT16179-0. For the T20 fasteners specified in this procedure.
Preparation and precautions
Electrical and machine safety
Disconnect the appliance completely from electrical power by unplugging the mains power plug before undertaking any disassembly.
Remove and empty the water tank.
Empty the bean hopper as thoroughly as possible (a vacuum cleaner can be used to remove remaining beans and debris).
Extract the complete grinder assembly from the machine chassis before beginning component-level disassembly.
Handling precautions
Work over a clean, flat, light-coloured surface. The grinder conveyor assembly contains three small detached steel balls and three small coil springs that can easily fall out and be lost.
Note the pre-existing alignment markings on the grinder housing before rotating or dismantling adjustment rings.
Step-by-step procedure
1. Removing the adjustment ring and grinding ring holder
Hold the grinder assembly firmly. Locate the three plastic retaining tabs securing the black outer adjustment gear ring (Mahlkranz) to the white grinder housing.
Carefully release all three retaining tabs and lift the black adjustment gear ring straight off the grinder.
Inspect the white outer threaded ring and adjacent housing parts for reference alignment marks. Confirm that the factory alignment line spans across all three relevant housing parts. If the mark is faded or missing, use a marker to draw a clear line across all three components before rotating anything.
Rotate the outer threaded adjustment ring counter-clockwise until it unthreads and loosens.
Lift the grinding ring holder (Mahlringhalter) vertically upward out of the grinder housing and set it aside.
2. Disassembling the grinding cone and conveyor assembly
Look into the center of the grinding cone (Mahlkegel). Locate the central Torx T20 fastening screw.
Engage the Torx T20 screwdriver in the screw head. Firmly grip the metal grinding cone by hand to prevent it from rotating while unscrewing the central screw counter-clockwise.
Remove the central Torx T20 screw along with the plastic bean intake auger (Einzugsschnecke) located underneath the screw head. Continue to hold the grinding cone in place.
Grasp the center of the grinding cone and turn the entire grinder unit upside down over the workbench.
Lower the grinding cone and the lower conveyor disc (Förderteller) assembly downward and out of the bottom of the housing.
Carefully separate the components of the conveyor assembly:
Remove the three small compression springs from their mounting bores.
Separate the plastic conveyor carrier from the metal driver plate.
Remove the three small steel balls seated between the plate and carrier.
3. Replacing the outer grinding ring
Take the grinding ring holder assembly removed in Section 1.
Locate the two locking tabs on the underside/inner section of the holder.
Using the size 5 slotted screwdriver, carefully press the two tabs inward and slightly downward to release the lower carrier insert.
Slide the lower insert ring completely out of the holder body.
On the remaining ring holder, locate the internal retaining tabs that lock the metal grinding ring into place.
Using the flat blade of the size 5 screwdriver, carefully pry one of the retaining tabs outward while tilting the metal grinding ring until it dislodges from the housing.
Remove the old grinding ring and position the new replacement grinding ring into the holder. Guide one side beneath one of the retaining tabs, then press the opposite side firmly inward until the ring snaps securely under the opposing tab.
Reinstall the lower carrier ring insert:
Align the locking tabs on the insert with the corresponding mating cutouts in the holder body.
Slide the lower insert into the holder body until both locking tabs engage with a distinct click.
4. Reassembling the conveyor plate, springs, and grinding cone
Place the plastic conveyor disc base on the workbench.
Place the metal driver plate onto the plastic conveyor base, ensuring the three holes in the metal plate align exactly with the corresponding holes in the plastic base.
Place one steel ball into each of the three aligned holes.
Place one compression spring into each of the three holes directly on top of the steel balls.
Turn the grinder housing upright and inspect the interior shaft cavity. Note the three matching internal recesses designed to accept the three springs.
Carefully align the three upward-protruding springs on the conveyor plate assembly with the three internal recesses in the grinder housing, and guide the assembly into place onto the drive shaft.
Place the new inner grinding cone over the shaft and onto the conveyor plate.
Install the plastic intake auger onto the central shaft. Ensure the key/guide on the bottom of the auger fits cleanly into the corresponding slot/groove on the conveyor driver.
Insert the central Torx T20 screw through the auger into the central shaft.
Hold the intake auger firmly down with your thumb to prevent movement while tightening the Torx T20 screw clockwise with the screwdriver until snug.
Reassembly and testing
1. Verifying assembly clearance
Inspect the coffee ground discharge chute on the side of the grinder body:
Look directly into the opening.
Critical check: There must be zero axial gap between the base of the grinding cone and the conveyor plate. If a gap is visible, the driver plate, balls, or auger guide are misaligned, and the central screw must be removed to correct the seating before continuing.
2. Installing and calibrating the grinding ring holder
Take the reassembled grinding ring holder and align its orientation tab with the corresponding guide slot on the white grinder housing.
Lower the grinding ring holder straight down into the housing.
Screw the outer threaded ring clockwise until the alignment marks drawn during preparation line up precisely into a continuous, single reference line.
Place the black adjustment gear ring (Mahlkranz) back onto the top of the grinder assembly.
Press down evenly on the black ring until all three plastic retaining tabs click securely over the housing rim.
Result and troubleshooting if the issue persists
Demonstrated result
Following this procedure replaces the worn cutting burrs and restores original factory reference alignment. The grinder rotates freely, and the burr surfaces maintain concentric, gap-free contact with the carrier plate.
Troubleshooting residual issues
Motor stalls or hums upon first use:
The outer adjustment ring may have been turned too far clockwise past the reference line, locking the burrs tightly against each other. Back off the ring counter-clockwise to the alignment mark.
A detached steel ball or spring may have shifted out of its bore during conveyor plate installation, mechanically jamming the drive spindle.
Grind remains too coarse:
Ensure the black gear ring is seated correctly and that the adjustment line across all three components was aligned accurately.
Check that the lower insert of the grinding ring holder is fully locked into place and not seated crookedly.
Limitations and missing specifications
Chassis removal: The steps required to open the Miele CM 6xxx exterior panels, disconnect grinder electrical wiring, and physically extract the grinder unit from the machine are not detailed in this procedure.
Torque values: The exact tightening torque for the central Torx T20 auger screw is not specified; it is hand-tightened until secure while holding the cone.
Fastener specifications: Thread size, pitch, and length of the central Torx screw are unrecorded.
Related guides
Miele CM 6xxx Series Drainage Valve Overhaul and Resealing Guide — Separate drainage-valve maintenance for the Miele CM 6xxx series.
Overhauling the Brew Unit on Miele CM 6xxx Coffee Machines — Brewing-unit seal maintenance for the same CM 6xxx series.