Overview and applicability

This technical article details the disassembly, internal inspection, cleaning, component replacement, and functional overhaul of a DeLonghi PrimaDonna Avant (Model: ESAM6700).

In this repair case, two non-functional ESAM 6700 units (one manufactured in 2008 and one in 2009) were evaluated. The 2009 unit possessed a sounder overall chassis but suffered from an unreadable display, heavy internal scale build-up, a leaking generator/upper boiler piston assembly, and a worn transmission spindle nut. The 2008 donor unit provided select functional components, supplemented by new cosmetic and mechanical replacement parts.

Applicability is confirmed strictly for the DeLonghi ESAM 6700 PrimaDonna Avant. Applying these steps to other ESAM-series models must be verified against model-specific technical documentation due to differences in boiler mounts, electronics, and panel configurations.

For boiler, drive and pump servicing, consult the De’Longhi ESAM6700 exploded-view diagram.

Symptoms and diagnosis

During initial evaluation and power-up testing:

  • Display failure: The 2009 machine powered on, but the front display backlight illuminated with missing or unreadable text segments. The 2008 donor machine exhibited a fully functioning display screen with legible diagnostic messages (such as "Kaffeesatzbehälter einsetzen!").

  • External and internal contamination: Both units showed significant grounds buildup in the internal crevices, bean hoppers, and lower chassis.

  • Water leak at the upper boiler/generator: Inspection revealed heavy limescale crusting, rust, and white calcium deposits around the heater block mounting plate, lower piston cylinder, and chassis floor directly beneath the upper boiler assembly.

  • Corroded boiler fasteners: Several structural bolts holding the heater and upper piston flange were severely rusted, leading to stripped heads that required manual gripping tools to extract.

  • Worn drive spindle nut: Disassembly of the transmission drive revealed that the internal threads of the plastic spindle nut housing were clogged with dried, degraded grease and stripped, causing mechanical play along the vertical threaded shaft.

  • Damaged high-pressure and low-pressure seals: Internal O-rings on the boiler riser tube and infuser were hardened, cracked, or deformed.

Tools, materials, and replacement parts

Tools used

  • Cordless drill/driver with long extension bits.

  • Phillips and Torx screwdrivers.

  • Hand ratchet (1/4-inch drive) with Phillips/Torx socket bits (Proxxon set).

  • Water pump pliers / pipe wrench (VBW No. 110 - 1").

  • Needle-nose pliers.

  • Precision pick / probe tools.

  • Tweezers.

  • Rotary multi-tool with small wire wheel/brush attachment.

  • Plastic trim pry tools.

  • Plastic tube cutter / hose shears.

  • Manual pump pressure sprayer.

  • Soft-bristled cleaning brushes.

  • Hot melt glue gun.

Materials and chemicals

  • Commercial liquid descaler (blue-dyed formulation; exact chemical concentration and brand unstated).

  • Degreasing detergent / foaming cleaner.

  • Clear cleaning / flushing fluid (applied to drive spindle during thread cleaning).

  • Food-grade silicone grease (applied via syringe).

  • Silica gel desiccant packs.

Replacement and donor parts

  • Functional front control panel / display module (sourced from the 2008 donor unit).

  • Replacement brass drive spindle nut (replacing the degraded plastic/metal insert nut).

  • Drive belt: Contitech HTD 225-3M-9 (replacing Megadyne Isoran).

  • New silicone water supply hoses and in-line mesh water filter.

  • Reinforcing coil spring (inserted inside bend-radius silicone tubing).

  • Ulka vibration water pump (Type EP5, 230V, 50Hz, 48W, 2/1 min, Cl. F) fitted with a plastic pump pulsation damper / membrane regulator (DeLonghi / Ulka membrane regulator assembly).

  • Replacement upper piston cylinder assembly and mounting bracket (salvaged and cleaned from donor machine).

  • O-rings for the upper piston, riser tubes, and brew group (EPDM/silicone food-safe seals).

  • New cosmetic parts: cup warming plate, drip tray grid, chrome inner drip tray insert, water tank with handle, and milk carafe assembly.

Note: Specific part numbers for the brass spindle nut upgrade and descaling fluid concentration were not stated in the source material.

If the drive assembly cannot be restored by repairing its individual components, the Complete DeLonghi EAM/ESAM drive assembly is a complete replacement option for the DeLonghi drive covered in this guide.

Products for this guide

  • Complete DeLonghi EAM/ESAM drive assembly — Brewive SKU 5513227951. Optional complete-drive replacement when repair of the existing assembly is not practical. A fault limited to the spindle nut or another serviceable part does not automatically require a new drive.

Torx T20H screwdriver — STHT16179-0

Hand screwdriver for the Torx fasteners discussed in this De’Longhi guide.

Preparation and precautions

  • Electrical shock hazard: Always disconnect the machine from the electrical mains supply before removing any side, top, or rear casing panels.

  • Thermal hazard: Ensure the machine is completely cold before servicing the thermoblock, steam generator, or hydraulic connections.

  • Moisture protection: All electronic components, wiring harnesses, printed circuit boards (PCBs), switches, and motors must remain completely dry during chemical application, spraying, and brush cleaning of the plastic chassis.


Step-by-step procedure

1. External panel disassembly

  1. Remove the water tank, drip tray, and coffee grounds container from the machine.

  2. Remove the rear Torx/Phillips screws securing the outer side and rear panels.

  3. Unclip and slide the left and right side casing panels rearward and off the chassis.

  4. Remove the screws fastening the top casing assembly (cup tray housing). Lift the top panel off carefully, freeing it from the internal bean hopper frame.

  5. Disconnect the ribbon cable connecting the front display panel to the main power board on the left side of the machine.

  6. Disengage the front control/display console screws, release the side clips, and pull the front display module away from the chassis.

  7. Detach the front lower metal trim panels around the coffee spout and door using needle-nose pliers and pick tools to release internal retention tabs.

2. Disassembly of the upper boiler and piston generator

  1. Inspect the upper aluminum boiler assembly. Note the positions of all wiring leads, temperature sensors, thermal fuses, and silicone water lines.

  2. Use a permanent marker to mark electrical connector positions and pairing orientations on the boiler lugs and wire shielding.

  3. Remove hose clamps using needle-nose pliers, then disconnect the translucent PTFE/silicone hydraulic lines leading into the boiler connectors.

  4. Unscrew the central and perimeter mounting screws securing the boiler to the chassis bracket.

  5. In cases where the upper boiler bracket screws are corroded:

    • Apply penetrant/cleaning solution if necessary.

    • If a screw head strips under drill torque, fit a 1/4-inch drive hand ratchet with an exact-fit screwdriver bit for higher manual leverage.

    • For heavily rusted perimeter screws that round out completely, grip the outer screw head firmly with a 1-inch pipe wrench / water pump pliers and break the fastener free manually.

  6. Lift the boiler casting off the upper bracket.

  7. Separate the brass/plastic cylinder sleeve and internal piston from the metal support plate:

    • Extract the mounting screws holding the plastic distributor body to the metal plate.

    • Separate the cylinder body, lower piston cap, internal counter-springs, and riser tubes.

    • Inspect the seals: discard cracked, brittle, or split O-rings.

3. Transmission drive removal and spindle nut rebuild

  1. Disconnect the power wiring leads to the transmission drive motor located on the central internal tower.

  2. Remove the vertical mounting screws securing the transmission drive rail frame inside the center chassis.

  3. Tilt and slide the entire drive assembly out of the machine body.

  4. Remove the upper grinder hopper screws and extract the hopper funnel to access internal motor fasteners.

  5. Disassemble the drive transmission housing:

    • Remove the drive motor mounting bracket screws.

    • Slide off the timing belt connecting the motor pinion to the large drive pulley.

    • Unfasten the longitudinal casing screws holding the two halves of the drive guide rail together.

    • Separate the guide rail halves to expose the threaded vertical drive spindle and moving carriage.

  6. Clean and re-thread the carriage:

    • Use a drill/driver attached to the drive shaft or an appropriate socket on the spindle end to rotate the carriage until it clears the threaded shaft.

    • Extract the old spindle nut from the carriage housing.

    • Clean accumulated debris, dried lubricant, and ground coffee from the threaded metal spindle shaft using a brush and solvent cleaner.

    • Install a replacement brass spindle nut into the plastic drive carriage housing.

    • Re-thread the carriage onto the cleaned spindle shaft and run it smoothly through its full travel length to ensure zero binding.

  7. Reassemble the transmission tower:

    • Place the spindle assembly back into the plastic rail half.

    • Join the rail sections and torque the perimeter housing screws evenly.

    • Remount the electric drive motor onto the metal plate.

    • Install a new Contitech HTD 225-3M-9 drive belt over the motor pinion and large drive gear.

    • Reinstall the assembled drive tower into the main chassis and tighten its mounting screws.

4. Grinder cleaning and disassembly

  1. Vacuum all residual coffee beans from the bean hopper and grinder throat.

  2. Unthread the central reverse/standard retaining screw on the inner conical burr cone.

  3. Lift out the inner conical burr and clear compacted coffee oils and fines.

  4. Remove the upper burr ring adjustment assembly.

  5. Clean out the grinder ejection chute using a pick tool, brush, and vacuum to ensure unobstructed ground coffee flow into the brew group chamber.

  6. Reassemble the burr set, ensuring proper seating of the burr alignment lugs before setting initial grind position.

5. Chassis cleaning and descaling

  1. With all mechanical and electrical modules unbolted or masked, clear dry grounds using brushes, picks, and vacuum suction.

  2. Apply a liquid descaling solution directly to areas with heavy calcium crusting and limescale run-off on the plastic chassis floor and water tank rail.

  3. Allow the descaler to react with the mineral deposits, agitating with a brush until the scale dissolves completely.

  4. Use a rotary tool with a small wire brush attachment to clean corroded metal mounting recesses and remove surface rust from non-critical chassis brackets.

  5. Apply foaming cleaner to the bare plastic chassis sections, scrub thoroughly with a soft-bristled brush, and rinse carefully using a clean water spray bottle.

  6. Ensure no water reaches terminal blocks, switches, or wiring harnesses; wipe the chassis completely dry.

6. Hydraulic pump upgrade and hose replacement

  1. Remove the old Ulka vibration pump from its rubber suspension mounts.

  2. Install a pulsation damper (membrane regulator) onto the outlet of the Ulka Type EP5 vibration pump to reduce operational noise.

  3. Connect new silicone intake and bypass tubing to the pump assembly:

    • Cut replacement food-grade silicone tubing to matching lengths using a plastic hose cutter to guarantee square, leak-free ends.

    • For tight-radius curves, insert an internal stainless steel coil spring inside the silicone hose to prevent kinking under suction or heat.

    • Install a new inline transparent water filter between the water tank inlet coupling and the pump suction side.

  4. Secure hose connections with proper spring wire hose clamps.

  5. Seat the pump assembly firmly back into the lower vibration damping brackets of the chassis.

7. Infuser / brew group refurbishment

  1. Disassemble the removable brewing group (infuser):

    • Unscrew the upper metal shower screen.

    • Unclip the front mechanical scraper and release the side lever arms.

    • Separate the upper and lower chamber halves.

  2. Remove old O-ring seals from the piston head and fluid couplers.

  3. Clean all coffee oil deposits from the filter screen, plastic cylinder, and counter-piston.

  4. Fit new food-grade rubber O-rings onto the piston body.

  5. Apply a uniform film of food-grade silicone grease to the piston O-rings and inner cylinder walls using a syringe applicator.

  6. Reassemble the infuser group, verify smooth mechanical movement of the compression mechanism, and lock it into the chassis guide.

8. Display panel desiccant addition

To mitigate display board failure caused by rising steam and humidity behind the front fascia:

  1. Open the rear housing cover of the operational front display console.

  2. Affix multiple small silica gel desiccant packets directly onto internal plastic surfaces using small beads of hot melt glue. Ensure the packets do not interfere with PCB seating, buttons, or wiring paths.

  3. Reseal the console housing and verify the ribbon cable remains free from pinching.


Reassembly and testing

Reassembly

  1. Remount the cleaned upper boiler assembly onto the central frame:

    • Fasten all structural screws.

    • Reconnect all wire leads, earthing connections, thermal fuse clips, and temperature sensors exactly as marked during teardown.

    • Reconnect high-pressure PTFE pipes to the boiler riser tube using fresh O-rings and insert hair-pin retention clips fully.

  2. Reinstall the front display module, reconnecting the main ribbon connector to the control PCB.

  3. Fasten the front metal facings, sliding spout cover, and side paneling.

  4. Install the new water tank, new chrome drip tray grid, inner tray insert, and grounds container.

Operational testing

  1. Fill the new water tank with fresh water and pour fresh coffee beans into the hopper.

  2. Connect the power cable to the mains supply and turn on the main power switch.

  3. Observe the front display: confirm the screen lights up with legible text, enters self-diagnosis, and completes the automated initial rinse cycle without error codes.

  4. Fill the milk carafe with milk and plug the connector into the front steam/hot water coupling.

  5. Place a glass under the coffee spouts and the milk frother spout.

  6. Select Latte Macchiato on the touch panel:

    • Observe the pump and frother operation: the machine draws milk, steams and froths it, and dispenses layered milk foam into the glass.

    • Verify that the grinder activates, doses grounds into the brew group, tamps, and dispenses an espresso shot cleanly through both front spouts.

    • Listen to pump sound levels: verify the pump operates quietly and smoothly without cavitation or high-pitched rattling.

    • Check the internal compartment and underneath the chassis immediately following the cycle for any signs of fluid leaks.


Result and troubleshooting if the issue persists

Achieved outcome

The combined restoration resulted in a fully operating machine with a clear, functional display, rebuilt transmission drive, upgraded pump assembly with reduced noise, clean hydraulic pathways, and full latte macchiato beverage dispensing.

Diagnostic checks if faults persist

Symptom

Probable Cause

Action

Water leaking under machine during brewing

Upper boiler piston O-rings or PTFE hose push-fit connectors not seated correctly.

Inspect the generator riser tube O-rings and hair-pin clip connections under pressure.

Grinder runs but no coffee dispensed / "Grounds too fine" error

Grinder burrs adjusted too tight or chute clogged with fines.

Adjust grinder knob coarser by 1–2 clicks during grinding; clear any residue from the chute.

Loud mechanical grinding or transmission jamming

Spindle nut binding or drive belt slipping.

Check tension on the Contitech HTD 225-3M-9 belt; ensure the brass spindle nut moves freely along the threaded shaft without obstruction.

Display blank or garbled characters

Loose ribbon cable or board damaged by steam.

Re-seat the flat ribbon cable connector on the main PCB; check display PCB for corrosion from moisture.

No milk foam / steam sputtering

Carafe coupler O-rings dry or missing; frother air vent blocked.

Lubricate carafe coupler seals with silicone grease; clean the milk carafe lid intake channels.


Limitations and missing specifications

  • Chemical concentration: The exact chemical formulation, acid percentage, and soak time for the descaling fluid were not specified.

  • Torque values: Exact fastener tightening torques for aluminum boiler castings and plastic transmission frames were not stated; over-tightening into plastic housings must be avoided.

  • Permanent display protection: Installing silica gel packs behind the control console is an improvised preventative measure against steam ingress; its long-term desiccant capacity and saturation limit inside an active coffee machine are unverified.

  • Operating pressure: Pump brewing pressure and thermoblock temperature were verified solely via successful liquid dispensing; quantitative manometer and temperature probe measurements were not performed.

Related guides